MANAGEMENT TEAM

Mr. Supachoke Apinyawonglers

Project Director / Deputy Manager

  • B.Eng. (Civil Engineering) Chiang Mai University, 2000
Registered Professional Engineer, Thailand
  • Professional Engineer, C.E. 8591
  • Associate Engineer, Env.E. 694
  • Building Inspector, บ. 1428/2551 
Experiences

Civil Tech Design and Consultants Co., Ltd.
Project Director / Deputy Manager  (2003-present)

S.C. Joint Venture 
Civil Engineer (2001-2003)

  • Mae Suai  Dam Project, Mae Suai, Chiang Rai

Siam General Engineering Consultants Co., Ltd.
Civil Engineer, (2000-2001)

  • Ground Improvement Supervision for New Bangkok International Airport, Samut Prakan
Expertise

Advisor / Construction Management for hospital projects

  • Bangkok Hospital, Soi Soonvijai
  • Bangkok Hospital, HuaHin
  • Bangkok Hospital, Phuket
  • Bangkok Hospital, Rayong
  • Samitivej Hospital, Sriracha
  • Samitivej Hospital, Sukhumvit
  • Samitivej Hospital, Chonburi
  • BNH Hospital, Silom-Sathorn, Bangkok
  • Royal Phnom Penh Hospital, Cambodia
  • Royal Angkor Hospital, Cambodia
  • Royal Ratanak Hospital, Cambodia
  • Phenix Medical Centre, Samutsakorn
  • Medic Pharma New Facilities, Rama II

Advisor / Engineering design / Construction Management  for education projects

  • Assumption College, Rayong
  • Assumption College English Program, Rama II

Advisor / Engineering design / Construction Management  Project References (Public and Private Sector)

  • Princess of Naradhiwas University
  • Ramkhamhaeng University
  • Royal Irrigation Department
  • Kampot Power Plant, Cambodia
  • Banzaan Fresh Market, Phuket
  • Meditation Center, Doi Saket, Chiangmai
  • The Sanctuary Condominium, Hua Hin, Prachuabkhirikhan
  • Angkor National Museum, Siemreap, Cambodia
  • Tourist Service Center, Siemreap, Cambodia